Ponderosa — Inspections
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/11/2017 | 04/11/2017 | Triple C Concrete of Lubbock,... | 1.50 | 1 |
| 03/28/2017 | 03/28/2017 | Triple C Concrete of Lubbock,... | 5.50 | 1 |
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/11/2017 | 04/11/2017 | Triple C Concrete of Lubbock,... | 1.50 | 1 |
| 03/28/2017 | 03/28/2017 | Triple C Concrete of Lubbock,... | 5.50 | 1 |