POPE PIT — Inspections

Total: 25 inspections

Begin End Operator Hours Inspectors
01/27/2010 01/27/2010 Fuller Gravel Co Inc 8.25 1
06/25/2009 06/25/2009 Fuller Gravel Co Inc 15.00 1
02/26/2009 02/27/2009 Fuller Gravel Co Inc 14.00 1
08/13/2008 08/13/2008 Fuller Gravel Co Inc 4.00 1
05/22/2008 05/24/2008 Fuller Gravel Co Inc 3.75 1
03/26/2008 03/27/2008 Fuller Gravel Co Inc 7.50 1
02/28/2008 02/29/2008 Fuller Gravel Co Inc 9.50 1
07/17/2007 07/17/2007 Fuller Gravel Co Inc 8.00 1
11/08/2006 11/08/2006 Fuller Gravel Co Inc 4.50 1
09/28/2006 09/28/2006 Fuller Gravel Co Inc 4.00 1
09/11/2006 09/12/2006 Fuller Gravel Co Inc 20.00 1
10/03/2005 10/06/2005 Fuller Gravel Co Inc 18.00 1
07/07/2005 07/07/2005 Fuller Gravel Co Inc 12.50 1
06/14/2005 06/14/2005 Fuller Gravel Co Inc 0.00 0
03/08/2005 03/08/2005 Fuller Gravel Co Inc 11.00 1
07/13/2004 07/13/2004 Fuller Gravel Co Inc 14.00 1
07/09/2003 07/10/2003 Fuller Gravel Co Inc 23.00 1
03/11/2003 03/11/2003 Fuller Gravel Co Inc 10.00 1
10/24/2002 10/24/2002 Fuller Gravel Co Inc 3.00 1
07/23/2002 07/23/2002 Fuller Gravel Co Inc 5.00 1
01/15/2002 01/16/2002 Fuller Gravel Co Inc 4.00 1
06/27/2001 06/28/2001 Fuller Gravel Co Inc 9.00 1
04/24/2001 04/24/2001 Fuller Gravel Co Inc 5.00 1
02/09/2000 02/09/2000 Fuller Gravel Co Inc 3.00 1
01/23/2000 01/23/2001 Fuller Gravel Co Inc 9.00 1