Port. Crusher 75-113 Cedar Rapid — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
10/23/2002 10/23/2002 Cooper & Sons Inc 2.00 1
08/06/2002 08/07/2002 Cooper & Sons Inc 28.00 2
06/06/2002 06/19/2002 Cooper & Sons Inc 33.00 1
10/24/2000 10/25/2000 Cooper & Sons Inc 11.00 1