PORTABLE #1 — Inspections
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/18/2016 | 05/18/2016 | PHAZE CONCRETE | 0.25 | 1 |
| 04/19/2016 | 04/19/2016 | PHAZE CONCRETE | 11.50 | 1 |
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/18/2016 | 05/18/2016 | PHAZE CONCRETE | 0.25 | 1 |
| 04/19/2016 | 04/19/2016 | PHAZE CONCRETE | 11.50 | 1 |