Portable #1 — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
09/22/2009 09/22/2009 Rock Hard Concrete Recycling 5.00 1
07/20/2009 07/20/2009 Rock Hard Concrete Recycling 1.50 1
09/24/2008 09/24/2008 Rock Hard Concrete Recycling 7.50 1
09/16/2008 09/16/2008 Rock Hard Concrete Recycling 15.75 1