Portable #1 — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
08/30/2016 08/31/2016 Canyon Construction 7.50 1
01/26/2016 01/26/2016 Canyon Construction 3.00 1
07/01/2014 07/01/2014 Canyon Construction 10.75 1