Portable 1 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/03/2018 | 05/03/2018 | Pinnacle Crushing and Construc... | 11.25 | 2 |
| 03/20/2018 | 03/22/2018 | Pinnacle Crushing and Construc... | 13.25 | 1 |
| 03/20/2018 | 03/22/2018 | Pinnacle Crushing and Construc... | 25.50 | 1 |
| 10/26/2016 | 10/27/2016 | Pinnacle Crushing and Construc... | 9.00 | 1 |