PORTABLE CRUSHER 05 — Inspections

Total: 10 inspections

Begin End Operator Hours Inspectors
12/05/2005 12/06/2005 CPC Southwest Materials Inc 8.00 1
08/17/2005 08/18/2005 Tucson Ready Mix Inc 8.75 1
11/17/2004 11/18/2004 Tucson Ready Mix Inc 9.00 1
07/20/2004 07/20/2004 Tucson Ready Mix Inc 4.00 1
07/07/2004 07/09/2004 Tucson Ready Mix Inc 7.00 1
03/02/2004 03/02/2004 Tucson Ready Mix Inc 10.00 1
04/17/2003 04/21/2003 Tucson Ready Mix Inc 22.00 2
08/21/2002 08/22/2002 Tucson Ready Mix Inc 12.00 2
04/24/2001 04/24/2001 Tucson Ready Mix Inc 9.00 2
03/02/2000 05/31/2000 Tucson Ready Mix Inc 26.00 1