PORTABLE CRUSHER #1 — Inspections

Total: 19 inspections

Begin End Operator Hours Inspectors
09/06/2011 09/06/2011 Saur Construction Inc 1.75 1
11/04/2010 11/04/2010 Saur Construction Inc 9.25 1
08/03/2010 08/06/2010 Saur Construction Inc 8.50 1
03/25/2010 03/25/2010 Saur Construction Inc 7.50 1
01/27/2009 01/29/2009 Saur Construction Inc 11.00 1
09/12/2008 09/12/2008 Saur Construction Inc 4.00 1
09/05/2008 09/08/2009 Saur Construction Inc 19.00 1
10/11/2007 10/11/2007 Saur Construction Inc 4.75 1
02/08/2007 02/12/2007 Saur Construction Inc 13.75 1
01/31/2006 01/31/2006 Saur Construction Inc 6.00 1
01/19/2006 01/20/2006 Saur Construction Inc 11.00 1
03/29/2005 03/29/2005 Saur Construction Inc 7.00 1
02/23/2004 02/23/2004 Saur Construction Inc 8.00 1
05/27/2003 05/29/2003 Saur Construction Inc 7.00 1
10/23/2002 10/23/2002 Saur Construction Inc 2.00 1
10/23/2002 10/23/2002 Saur Construction Inc 0.00 0
12/18/2001 12/18/2001 Saur Construction Inc 3.00 1
11/07/2001 11/07/2001 Saur Construction Inc 13.00 1
02/28/2001 02/28/2001 Saur Construction Inc 16.00 1