Portable Crusher 2 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/16/2025 | 04/17/2025 | MULLINAX INC | 7.00 | 1 |
| 03/21/2023 | 03/29/2023 | MULLINAX INC | 17.00 | 1 |
| 12/16/2021 | 12/17/2021 | MULLINAX INC | 7.75 | 1 |
| 01/06/2021 | 01/12/2021 | MULLINAX INC | 12.50 | 1 |