Portable Eljay Plant — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/08/2002 | 10/08/2002 | Quality Excavating | 4.00 | 1 |
| 08/06/2002 | 08/06/2002 | Quality Excavating | 11.00 | 1 |
| 07/09/2002 | 07/09/2002 | Quality Excavating | 6.00 | 1 |
| 07/31/2001 | 08/01/2001 | Quality Excavating | 78.00 | 2 |