PORTABLE ONE — Inspections

Total: 25 inspections

Begin End Operator Hours Inspectors
11/19/2014 11/20/2014 Beckler Construction 3.75 1
08/18/2014 08/18/2014 Beckler Construction 4.25 1
08/13/2014 08/13/2014 Beckler Construction 8.50 1
05/08/2013 05/08/2013 Beckler Construction 11.00 1
03/29/2012 03/29/2012 Beckler Construction 15.50 1
09/01/2011 09/01/2011 Beckler Construction 1.75 1
05/31/2011 06/01/2011 Beckler Construction 16.25 1
03/30/2011 03/30/2011 Beckler Construction 6.00 1
07/12/2010 07/12/2010 Beckler Construction 10.50 1
08/31/2009 08/31/2009 Beckler Construction 1.75 1
06/16/2009 06/17/2009 Beckler Construction 7.25 1
06/12/2008 06/12/2008 Beckler Construction 4.00 1
05/28/2008 05/28/2008 Beckler Construction 8.00 1
07/18/2007 07/18/2007 Beckler Construction 3.00 1
12/13/2006 12/13/2006 Beckler Construction 4.00 1
07/20/2006 07/20/2006 Beckler Construction 2.00 1
06/20/2006 06/21/2006 Beckler Construction 22.00 1
09/21/2005 09/21/2005 Beckler Construction 5.00 1
09/02/2004 09/02/2004 Beckler Construction 7.00 1
03/18/2004 03/18/2004 Beckler Construction 9.00 1
04/17/2003 04/17/2003 Beckler Construction 4.00 1
04/15/2003 04/15/2003 Beckler Construction 7.00 1
07/16/2002 07/16/2002 Beckler Construction 8.00 1
10/01/2001 10/01/2001 Beckler Construction 4.00 1
09/13/2001 09/13/2001 Beckler Construction 8.00 1