Portable Plant #1 — Inspections

Total: 13 inspections

Begin End Operator Hours Inspectors
05/15/2013 05/15/2013 M.R. Tanner Mining, Inc. 23.00 3
03/12/2013 03/13/2013 M.R. Tanner Mining, Inc. 7.75 1
08/16/2012 08/16/2012 M.R. Tanner Mining, Inc. 6.25 1
08/09/2012 08/10/2012 M.R. Tanner Mining, Inc. 15.75 1
01/31/2012 01/31/2012 M.R. Tanner Mining, Inc. 11.75 1
04/26/2011 04/27/2011 M.R. Tanner Mining, Inc. 24.00 1
04/05/2010 04/07/2010 M.R. Tanner Mining, Inc. 14.50 1
12/29/2008 12/29/2008 M.R. Tanner Mining, Inc. 7.25 1
02/21/2008 02/22/2008 M.R. Tanner Mining, Inc. 4.00 1
01/22/2007 01/23/2007 M.R. Tanner Mining, Inc. 9.25 1
05/15/2006 05/17/2006 M.R. Tanner Mining, Inc. 35.50 1
12/13/2005 12/14/2005 M.R. Tanner Mining, Inc. 4.00 1
04/26/2005 04/26/2005 M.R. Tanner Mining, Inc. 13.50 1