Portable Plant #1 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
06/06/2006 06/13/2006 Feather River Materials Inc 23.75 1
08/24/2005 08/24/2005 Feather River Materials Inc 4.25 1
08/24/2004 08/25/2004 Feather River Materials Inc 13.00 1
06/24/2003 06/25/2003 Feather River Materials Inc 31.00 2
08/07/2002 08/07/2002 Feather River Materials Inc 9.00 1
08/29/2001 09/06/2001 Feather River Materials Inc 15.00 1