PORTABLE PLANT #2 — Inspections

Total: 13 inspections

Begin End Operator Hours Inspectors
01/13/2014 01/13/2014 M R TANNER MINING INC 6.00 1
09/03/2013 09/05/2013 M R TANNER MINING INC 19.50 2
02/21/2013 02/21/2013 M R TANNER MINING INC 7.75 1
04/25/2012 04/27/2012 M R TANNER MINING INC 26.00 1
10/05/2011 10/11/2011 M R TANNER MINING INC 34.50 1
02/03/2011 02/04/2011 M R TANNER MINING INC 4.75 1
05/17/2010 05/17/2010 M R TANNER MINING INC 4.00 1
03/24/2010 03/25/2010 M R TANNER MINING INC 24.50 1
03/23/2009 03/24/2009 M R TANNER MINING INC 16.00 1
10/24/2007 10/25/2007 M R TANNER MINING INC 10.00 1
06/07/2007 06/07/2007 M R TANNER MINING INC 1.00 1
01/24/2007 01/24/2007 M R TANNER MINING INC 4.50 1
08/02/2006 08/02/2006 M R TANNER MINING INC 9.00 1