Portable Plant #2 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/24/2015 | 06/24/2015 | Knife River Corporation - NC D... | 29.50 | 1 |
| 06/24/2015 | 06/24/2015 | Knife River Corporation - NC D... | 0.50 | 1 |
| 06/17/2014 | 06/17/2014 | Knife River Corporation - NC D... | 11.50 | 1 |
| 12/13/2012 | 12/19/2012 | Knife River Corporation - NC D... | 31.00 | 1 |