Portable Plant #2 Rockster — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
09/01/2020 09/03/2020 Hutchens Construction Co LLC 10.75 1
03/26/2019 03/27/2019 Hutchens Construction Co 18.00 1
12/27/2017 12/27/2017 Hutchens Construction Co 21.25 2
03/27/2017 03/28/2017 Hutchens Construction Co 13.25 1