PORTABLE PLANT — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
11/02/2006 11/03/2006 MATERIAL PROCESSING INC 8.00 1
07/11/2006 07/14/2006 MATERIAL PROCESSING INC 29.00 1
07/05/2005 07/07/2005 MATERIAL PROCESSING INC 23.00 1