PORTABLE PLANT - DREDGE OPERATION — Inspections

Total: 23 inspections

Begin End Operator Hours Inspectors
10/23/2024 10/23/2024 BOWES CONSTRUCTION, INC 8.75 1
08/14/2024 08/14/2024 BOWES CONSTRUCTION, INC 3.25 1
08/09/2023 08/10/2023 BOWES CONSTRUCTION, INC 5.50 1
09/07/2022 09/07/2022 BOWES CONSTRUCTION, INC 14.50 1
10/27/2020 10/27/2020 BOWES CONSTRUCTION, INC 8.25 1
08/26/2020 08/27/2020 BOWES CONSTRUCTION, INC 12.75 1
07/22/2020 07/22/2020 BOWES CONSTRUCTION, INC 2.75 1
07/07/2020 07/08/2020 BOWES CONSTRUCTION, INC 2.50 1
11/27/2019 11/27/2019 BOWES CONSTRUCTION, INC 0.75 1
06/25/2019 06/27/2019 BOWES CONSTRUCTION, INC 13.25 1
07/11/2018 07/12/2018 BOWES CONSTRUCTION, INC 16.75 1
11/09/2016 11/09/2016 BOWES CONSTRUCTION, INC 11.00 1
03/30/2016 03/30/2016 BOWES CONSTRUCTION, INC 1.00 1
03/29/2016 03/30/2016 BOWES CONSTRUCTION, INC 19.50 1
08/06/2015 08/06/2015 BOWES CONSTRUCTION, INC 10.00 1
07/09/2014 07/09/2014 BOWES CONSTRUCTION, INC 17.00 1
07/09/2013 07/09/2013 BOWES CONSTRUCTION, INC 13.50 1
08/09/2012 08/09/2012 BOWES CONSTRUCTION, INC 10.00 1
08/01/2012 08/01/2012 BOWES CONSTRUCTION, INC 43.50 2
06/15/2011 06/15/2011 BOWES CONSTRUCTION, INC 13.00 1
05/19/2010 05/19/2010 BOWES CONSTRUCTION, INC 4.75 1
05/04/2010 05/05/2010 BOWES CONSTRUCTION, INC 21.00 1
06/24/2009 06/24/2009 BOWES CONSTRUCTION, INC 13.00 1