Portable Plant No.1 — Inspections
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/26/2007 | 06/29/2007 | Klett Recycle, Inc. | 4.50 | 1 |
| 07/17/2006 | 08/21/2006 | Klett Recycle, Inc. | 25.50 | 1 |
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/26/2007 | 06/29/2007 | Klett Recycle, Inc. | 4.50 | 1 |
| 07/17/2006 | 08/21/2006 | Klett Recycle, Inc. | 25.50 | 1 |