Portable Screen #3 — Inspections
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/23/2025 | 06/26/2025 | Noble Excavating, Inc | 9.25 | 1 |
| 09/11/2024 | 09/12/2024 | Noble Excavating, Inc | 7.75 | 1 |
| 06/05/2023 | 06/07/2023 | Noble Excavating, Inc | 6.75 | 1 |
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/23/2025 | 06/26/2025 | Noble Excavating, Inc | 9.25 | 1 |
| 09/11/2024 | 09/12/2024 | Noble Excavating, Inc | 7.75 | 1 |
| 06/05/2023 | 06/07/2023 | Noble Excavating, Inc | 6.75 | 1 |