Portable Screen Plant #1 — Inspections
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/06/2005 | 07/06/2005 | Dresel Contracting, Inc. | 7.00 | 1 |
| 05/13/2003 | 05/14/2003 | Dresel Contracting, Inc. | 15.00 | 1 |
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/06/2005 | 07/06/2005 | Dresel Contracting, Inc. | 7.00 | 1 |
| 05/13/2003 | 05/14/2003 | Dresel Contracting, Inc. | 15.00 | 1 |