PORTABLE SCREENING AND CRUSHING — Inspections
Total: 9 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 04/21/2003 | 04/21/2003 | Rollin Graves Excavating | 3.00 | 1 |
| 02/19/2003 | 02/19/2003 | Rollin Graves Excavating | 4.00 | 1 |
| 09/13/2002 | 09/13/2002 | Rollin Graves Excavating | 4.00 | 1 |
| 07/31/2002 | 08/02/2002 | Rollin Graves Excavating | 25.00 | 2 |
| 04/02/2002 | 04/02/2002 | Rollin Graves Excavating | 4.00 | 1 |
| 12/18/2001 | 12/18/2001 | Rollin Graves Excavating | 13.00 | 1 |
| 08/14/2001 | 08/14/2001 | Rollin Graves Excavating | 9.00 | 1 |
| 09/06/2000 | 09/08/2000 | Rollin Graves Excavating | 7.00 | 1 |
| 08/30/2000 | 09/01/2000 | Rollin Graves Excavating | 7.00 | 1 |