Portable Screening Plant — Inspections
Total: 18 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/27/2021 | 07/28/2021 | Andrzejek Cherp Excavating Inc | 2.00 | 1 |
| 07/22/2020 | 07/22/2020 | Andrzejek Cherp Excavating Inc | 0.75 | 1 |
| 06/25/2020 | 06/25/2020 | Andrzejek Cherp Excavating Inc | 6.50 | 1 |
| 06/12/2019 | 06/12/2019 | Andrzejek Cherp Excavating Inc | 6.00 | 1 |
| 09/12/2018 | 09/12/2018 | Andrzejek Cherp Excavating Inc | 4.75 | 1 |
| 07/18/2017 | 07/18/2017 | Andrzejek Cherp Excavating Inc | 3.50 | 1 |
| 05/04/2016 | 05/05/2016 | Andrzejek Cherp Excavating Inc | 7.50 | 1 |
| 10/27/2014 | 10/27/2014 | Andrzejek Cherp Excavating Inc | 8.25 | 1 |
| 05/20/2014 | 05/20/2014 | Andrzejek Cherp Excavating Inc | 6.00 | 1 |
| 07/09/2013 | 07/09/2013 | Andrzejek Cherp Excavating Inc | 4.25 | 1 |
| 09/11/2012 | 09/11/2012 | Andrzejek Cherp Excavating Inc | 4.25 | 1 |
| 08/03/2011 | 08/03/2011 | Andrzejek Cherp Excavating Inc | 6.00 | 1 |
| 07/26/2011 | 07/26/2011 | Andrzejek Cherp Excavating Inc | 8.75 | 1 |
| 09/15/2010 | 09/15/2010 | Andrzejek Cherp Excavating Inc | 6.75 | 1 |
| 09/22/2009 | 09/22/2009 | Andrzejek Cherp Excavating Inc | 6.00 | 1 |
| 08/25/2009 | 08/25/2009 | Andrzejek Cherp Excavating Inc | 8.25 | 1 |
| 09/17/2008 | 09/17/2008 | Andrzejek Cherp Excavating Inc | 6.50 | 1 |
| 09/03/2008 | 09/03/2008 | Andrzejek Cherp Excavating Inc | 10.00 | 1 |