Portable Wash Plant #1 — Inspections

Total: 25 inspections

Begin End Operator Hours Inspectors
07/23/2025 07/23/2025 Douds Stone LLC 3.00 1
08/08/2024 08/08/2024 Douds Stone LLC 4.50 1
07/18/2023 07/18/2023 Douds Stone LLC 0.75 1
09/06/2022 09/06/2022 Douds Stone LLC 7.25 1
05/20/2021 05/20/2021 Douds Stone LLC 9.50 1
04/13/2020 04/13/2020 Douds Stone LLC 9.75 1
05/30/2019 05/30/2019 Douds Stone LLC 2.00 1
05/01/2019 05/02/2019 Douds Stone LLC 21.25 1
05/07/2018 05/08/2018 Douds Stone LLC 10.25 1
10/18/2016 10/18/2016 Douds Stone LLC 3.25 1
10/07/2015 10/07/2015 Douds Stone LLC 6.50 1
10/29/2014 10/29/2014 Douds Stone LLC 7.50 1
07/08/2014 07/08/2014 Douds Stone LLC 15.75 1
08/07/2013 08/07/2013 Douds Stone LLC 1.50 1
06/19/2013 06/19/2013 Douds Stone LLC 2.00 1
04/05/2012 04/09/2012 Douds Stone, Inc. 14.50 1
02/23/2011 02/23/2011 Douds Stone, Inc. 5.25 1
10/07/2009 10/07/2009 Douds Stone, Inc. 4.00 1
04/15/2009 04/15/2009 Douds Stone, Inc. 18.00 1
03/25/2008 03/25/2008 Douds Stone, Inc. 6.50 1
10/17/2007 10/17/2007 Douds Stone, Inc. 1.50 1
10/11/2007 10/11/2007 Douds Stone, Inc. 8.00 1
09/12/2007 09/12/2007 Douds Stone, Inc. 7.50 1
07/11/2007 07/11/2007 Douds Stone, Inc. 6.50 1
08/01/2006 08/01/2006 Douds Stone, Inc. 11.75 1