Portable Wash Plant # 3 — Inspections

Total: 19 inspections

Begin End Operator Hours Inspectors
07/22/2025 07/24/2025 Douds Stone LLC 15.25 1
08/20/2024 08/20/2024 Douds Stone LLC 7.25 1
07/11/2023 07/11/2023 Douds Stone LLC 3.25 1
08/15/2022 08/15/2022 Douds Stone LLC 3.25 1
11/03/2020 11/03/2020 Douds Stone LLC 4.75 1
03/02/2020 03/04/2020 Douds Stone LLC 14.50 1
07/24/2019 07/24/2019 Douds Stone LLC 0.50 1
09/04/2018 09/04/2018 Douds Stone LLC 0.75 1
10/11/2016 10/13/2016 Douds Stone LLC 17.75 1
08/09/2016 08/09/2016 Douds Stone LLC 2.25 1
07/28/2015 07/28/2015 Douds Stone LLC 4.75 1
04/29/2014 04/29/2014 Douds Stone LLC 7.50 1
08/07/2013 08/07/2013 Douds Stone LLC 0.75 1
08/06/2013 08/06/2013 Douds Stone LLC 2.00 1
04/02/2012 04/03/2012 Douds Stone, Inc. 20.25 1
09/28/2011 09/28/2011 Douds Stone, Inc. 17.25 1
10/14/2010 10/15/2010 Douds Stone, Inc. 8.75 1
10/08/2009 10/08/2009 Douds Stone, Inc. 6.00 1
06/24/2009 06/24/2009 Douds Stone, Inc. 8.00 1