Powerscreen 1800 Warrior PID00123PDGF299 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
05/07/2025 05/07/2025 Joy Engineering 8.50 1
03/03/2025 03/05/2025 Joy Engineering 4.00 1
08/06/2024 08/07/2024 Joy Engineering 2.50 1
01/17/2024 01/17/2024 Joy Engineering 2.75 1
06/03/2023 06/03/2023 Joy Engineering 3.00 1
08/15/2022 08/16/2022 Joy Engineering 1.75 1