Powerscreen — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/01/2009 | 06/02/2009 | T.G. McCauley Construction | 17.50 | 1 |
| 01/08/2009 | 01/08/2009 | T.G. McCauley Construction | 12.00 | 1 |
| 08/13/2008 | 08/13/2008 | T.G. McCauley Construction | 3.50 | 1 |
| 07/31/2008 | 07/31/2008 | T.G. McCauley Construction | 13.00 | 1 |