Prep Plant — Inspections

Total: 157 inspections

Begin End Operator Hours Inspectors
03/20/2002 03/20/2002 Left Fork Mining Co Inc 3.00 1
02/26/2002 02/26/2002 Left Fork Mining Co Inc 5.00 1
08/22/2001 09/06/2001 Left Fork Mining Co Inc 11.50 1
02/05/2001 02/08/2001 Left Fork Mining Co Inc 10.00 1
01/09/2001 01/10/2001 Left Fork Mining Co Inc 8.25 1
06/21/2000 06/21/2000 Left Fork Mining Co Inc 8.00 1
03/17/2000 03/17/2000 Left Fork Mining Co Inc 8.00 1