Pride Mine — Inspections

Total: 38 inspections

Begin End Operator Hours Inspectors
07/13/2011 07/13/2011 B B Mining Inc. 3.50 1
09/26/2008 09/26/2008 B B Mining Inc. 3.50 1
03/31/2008 03/31/2008 B B Mining Inc. 3.00 1
10/03/2006 10/03/2006 B B Mining Inc. 1.50 1
03/30/2006 03/30/2006 B B Mining Inc. 2.50 1
06/27/2005 06/27/2005 B B Mining Inc. 8.00 1
03/31/2005 03/31/2005 B B Mining Inc. 8.00 2
02/02/2005 02/02/2005 B B Mining Inc. 12.00 2
02/01/2005 02/01/2005 B B Mining Inc. 4.50 1
11/10/2004 11/10/2004 B B Mining Inc. 2.50 1
11/04/2004 01/20/2005 B B Mining Inc. 22.50 2
10/25/2004 10/25/2004 B B Mining Inc. 0.00 0
09/23/2004 09/30/2004 B B Mining Inc. 7.00 1
09/08/2004 09/09/2004 B B Mining Inc. 10.50 1
04/22/2004 05/04/2004 B B Mining Inc. 42.50 1
03/08/2004 03/10/2004 B B Mining Inc. 18.50 1
07/02/2003 09/25/2003 B B Mining Inc. 66.00 2
10/15/2002 01/06/2003 B B Mining Inc. 62.00 2
06/13/2002 06/13/2002 B B Mining Inc. 3.00 1
05/30/2002 05/31/2002 B B Mining Inc. 14.00 1
05/28/2002 08/08/2002 B B Mining Inc. 40.00 1
04/11/2002 04/11/2002 B B Mining Inc. 3.50 1
02/13/2002 04/17/2002 B B Mining Inc. 30.50 1
01/03/2002 04/05/2002 B B Mining Inc. 27.00 2
01/02/2002 03/25/2002 B B Mining Inc. 27.00 2
10/29/2001 10/30/2001 B B Mining Inc. 11.00 1
07/30/2001 09/26/2001 B B Mining Inc. 25.50 1
04/24/2001 04/26/2001 B B Mining Inc. 13.00 1
04/17/2001 04/18/2001 B B Mining Inc. 18.00 1
04/11/2001 07/12/2001 B B Mining Inc. 69.00 1
12/11/2000 12/11/2000 B B Mining Inc. 3.50 1
10/19/2000 11/22/2000 B B Mining Inc. 38.50 1
07/31/2000 08/11/2000 B B Mining Inc. 41.50 2
05/31/2000 09/27/2000 B B Mining Inc. 7.25 1
05/31/2000 05/31/2000 B B Mining Inc. 6.75 1
05/05/2000 05/05/2000 B B Mining Inc. 9.00 2
01/20/2000 01/20/2000 B B Mining Inc. 2.75 1
01/13/2000 01/14/2000 B B Mining Inc. 18.50 1