Total: 18 inspections

Begin End Operator Hours Inspectors
10/19/2004 12/15/2004 No.1 Contractor Inc. 18.00 2
04/01/2004 09/27/2004 No.1 Contractor Inc. 94.00 2
03/01/2004 03/01/2004 No.1 Contractor Inc. 8.00 1
09/30/2003 02/19/2004 No.1 Contractor Inc. 110.75 2
05/09/2003 09/25/2003 No.1 Contractor Inc. 131.75 4
04/03/2003 04/10/2003 No.1 Contractor Inc. 22.00 1
03/12/2003 03/12/2003 No.1 Contractor Inc. 8.00 1
02/20/2003 02/20/2003 No.1 Contractor Inc. 9.50 1
10/28/2002 11/14/2002 No.1 Contractor Inc. 67.75 2
10/04/2002 02/26/2003 No.1 Contractor Inc. 95.25 4
09/25/2002 10/02/2002 No.1 Contractor Inc. 16.00 1
09/18/2002 09/19/2002 No.1 Contractor Inc. 16.00 1
09/17/2002 10/03/2002 No.1 Contractor Inc. 33.00 1
09/16/2002 09/17/2002 No.1 Contractor Inc. 15.50 1
09/09/2002 09/18/2002 No.1 Contractor Inc. 17.00 1
04/04/2002 09/09/2002 No.1 Contractor Inc. 33.00 1
01/22/2002 03/15/2002 No.1 Contractor Inc. 78.00 2
12/17/2001 03/20/2002 No.1 Contractor Inc. 49.00 1