PS 16 — Inspections
Total: 23 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/13/2012 | 02/14/2012 | G Lopes Construction Inc | 7.00 | 1 |
| 07/26/2011 | 07/26/2011 | G Lopes Construction Inc | 5.50 | 1 |
| 04/12/2011 | 04/12/2011 | G Lopes Construction Inc | 2.50 | 1 |
| 03/28/2011 | 03/29/2011 | G Lopes Construction Inc | 13.00 | 1 |
| 09/07/2010 | 09/08/2010 | G Lopes Construction Inc | 16.00 | 1 |
| 04/14/2010 | 04/14/2010 | G Lopes Construction Inc | 5.50 | 1 |
| 12/01/2008 | 12/04/2008 | G Lopes Construction Inc | 14.75 | 1 |
| 04/28/2008 | 04/30/2008 | G Lopes Construction Inc | 3.50 | 1 |
| 01/18/2007 | 01/18/2007 | G Lopes Construction Inc | 2.50 | 1 |
| 05/01/2006 | 05/04/2006 | G Lopes Construction Inc | 17.50 | 1 |
| 07/12/2005 | 07/13/2005 | G Lopes Construction Inc | 6.00 | 1 |
| 04/26/2005 | 04/27/2005 | G Lopes Construction Inc | 17.00 | 1 |
| 06/21/2004 | 06/21/2004 | G Lopes Construction Inc | 7.00 | 1 |
| 06/08/2004 | 06/09/2004 | G Lopes Construction Inc | 26.00 | 1 |
| 11/04/2003 | 11/04/2003 | G Lopes Construction Inc | 5.00 | 1 |
| 02/24/2003 | 02/26/2003 | G Lopes Construction Inc | 16.00 | 1 |
| 01/16/2002 | 01/16/2002 | G Lopes Construction Inc | 4.00 | 1 |
| 01/03/2002 | 01/03/2002 | G Lopes Construction Inc | 3.00 | 1 |
| 11/28/2001 | 11/29/2001 | G Lopes Construction Inc | 13.00 | 1 |
| 07/24/2001 | 07/24/2001 | G Lopes Construction Inc | 4.00 | 1 |
| 03/19/2001 | 03/19/2001 | G Lopes Construction Inc | 5.00 | 1 |
| 03/08/2001 | 03/08/2001 | G Lopes Construction Inc | 2.00 | 1 |
| 12/13/2000 | 12/14/2000 | G Lopes Construction Inc | 23.00 | 1 |