PS 17 — Inspections
Total: 17 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/31/2020 | 08/31/2020 | G Lopes Construction Inc | 1.25 | 1 |
| 08/05/2019 | 08/05/2019 | G Lopes Construction Inc | 4.00 | 1 |
| 08/30/2017 | 08/30/2017 | G Lopes Construction Inc | 2.50 | 1 |
| 12/20/2016 | 12/21/2016 | G Lopes Construction Inc | 8.25 | 1 |
| 07/26/2016 | 07/28/2016 | G Lopes Construction Inc | 6.75 | 1 |
| 06/02/2015 | 06/03/2015 | G Lopes Construction Inc | 9.00 | 1 |
| 08/27/2013 | 08/29/2013 | G Lopes Construction Inc | 4.50 | 1 |
| 01/19/2012 | 01/19/2012 | G Lopes Construction Inc | 4.75 | 1 |
| 04/05/2011 | 04/08/2011 | G Lopes Construction Inc | 10.75 | 1 |
| 12/29/2009 | 12/30/2009 | G Lopes Construction Inc | 3.50 | 1 |
| 03/16/2009 | 03/17/2009 | G Lopes Construction Inc | 4.75 | 1 |
| 03/12/2009 | 03/12/2009 | G Lopes Construction Inc | 4.50 | 1 |
| 03/04/2009 | 03/06/2009 | G Lopes Construction Inc | 12.25 | 1 |
| 04/14/2008 | 04/18/2008 | G Lopes Construction Inc | 23.50 | 1 |
| 02/07/2007 | 02/07/2007 | G Lopes Construction Inc | 2.00 | 1 |
| 01/25/2007 | 01/26/2007 | G Lopes Construction Inc | 9.50 | 1 |
| 03/30/2006 | 04/03/2006 | G Lopes Construction Inc | 5.00 | 1 |