PWP #2 — Inspections

Total: 15 inspections

Begin End Operator Hours Inspectors
06/20/2011 06/21/2011 Hallett Materials 3.75 1
09/22/2010 09/22/2010 Hallett Materials 2.00 1
08/30/2010 08/31/2010 Hallett Materials 11.00 1
10/29/2008 10/29/2008 Hallett Materials 8.00 1
07/31/2008 07/31/2008 Hallett Materials 6.50 1
10/24/2006 10/24/2006 Hallett Materials Inc 6.25 1
02/14/2006 02/14/2006 Hallett Materials Inc 7.50 1
03/30/2005 03/30/2005 Hallett Materials Inc 6.00 1
03/30/2004 04/06/2004 Hallett Materials Inc 28.00 1
07/01/2003 07/01/2003 Hallett Materials Inc 9.00 1
10/21/2002 10/21/2002 Hallett Materials Inc 4.00 2
05/29/2002 05/29/2002 Hallett Materials Inc 8.00 1