Quinn's Quarry — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
10/19/2017 10/19/2017 Substratum Excavation 8.50 1
07/17/2017 07/19/2017 Substratum Excavation 21.50 1
06/11/2015 06/11/2015 Substratum Excavation 3.50 1
11/26/2013 11/26/2013 Substratum Excavation 1.25 1
11/13/2013 11/14/2013 Substratum Excavation 17.75 1
09/19/2013 09/19/2013 Substratum Excavation 1.00 1
08/07/2013 08/07/2013 Substratum Excavation 12.25 1
08/07/2013 08/07/2013 Substratum Excavation 4.75 1
02/28/2013 02/28/2013 Substratum Excavation 0.75 1
12/05/2011 12/06/2011 Substratum Excavation 12.50 1
08/03/2011 08/09/2011 Substratum Excavation 28.00 1
07/13/2010 07/15/2010 Substratum Excavation 29.00 1