QUIRION Astec Track Screen — Inspections

Total: 8 inspections

Begin End Operator Hours Inspectors
09/09/2024 09/09/2024 QUIRION 2.75 1
08/28/2024 08/28/2024 QUIRION 6.75 1
04/24/2023 04/27/2023 QUIRION 20.50 1
06/28/2022 06/28/2022 QUIRION 5.00 1
10/06/2020 10/15/2020 Quirion Construction Inc 44.75 1
10/07/2019 10/09/2019 Quirion Construction Inc 11.00 1
10/02/2019 10/03/2019 Quirion Construction Inc 9.00 1
08/27/2012 08/27/2012 Quirion Construction Inc 6.50 1