Ravena Plant #2 — Inspections

Total: 24 inspections

Begin End Operator Hours Inspectors
06/06/2011 06/09/2011 Callanan Industries Inc 28.25 1
12/06/2010 12/13/2010 Callanan Industries Inc 48.00 2
09/20/2010 09/22/2010 Callanan Industries Inc 17.50 1
08/02/2010 08/05/2010 Callanan Industries Inc 39.75 1
11/23/2009 11/24/2009 Callanan Industries Inc 19.50 1
03/04/2009 03/06/2009 Callanan Industries Inc 23.75 1
11/12/2008 11/14/2008 Callanan Industries Inc 33.50 1
04/22/2008 04/22/2008 Callanan Industries Inc 11.00 1
01/17/2008 01/17/2008 Callanan Industries Inc 6.75 1
06/25/2007 06/28/2007 Callanan Industries Inc 33.50 1
01/03/2007 01/04/2007 Callanan Industries Inc 15.00 1
05/23/2006 05/25/2006 Callanan Industries Inc 16.00 1
01/04/2006 01/04/2006 Callanan Industries Inc 4.75 2
08/11/2005 08/15/2005 Callanan Industries Inc 5.25 1
05/24/2005 06/01/2005 Callanan Industries Inc 30.75 1
12/13/2004 12/14/2004 Callanan Industries Inc 14.00 1
04/29/2004 04/29/2004 Callanan Industries Inc 16.00 1
01/28/2004 01/28/2004 Callanan Industries Inc 3.00 1
11/17/2003 11/19/2003 Callanan Industries Inc 74.00 3
01/22/2003 01/23/2003 Callanan Industries Inc 5.00 1
01/21/2003 01/22/2003 Callanan Industries Inc 16.00 1
10/16/2002 10/16/2002 Callanan Industries Inc 5.00 1
02/04/2002 02/06/2002 Callanan Industries Inc 13.00 1
02/03/2000 02/04/2000 Callanan Industries Inc 10.00 1