Red Cedar Surface Mine — Inspections

Total: 77 inspections

Begin End Operator Hours Inspectors
02/09/2006 02/09/2006 Endurance Mining 5.50 1
11/28/2005 12/08/2005 Endurance Mining 65.00 2
09/28/2005 01/23/2006 Endurance Mining 29.00 3
05/20/2005 06/16/2005 Endurance Mining 128.00 2
04/18/2005 01/20/2006 Endurance Mining 76.50 1
11/30/2004 12/13/2004 Endurance Mining 17.00 1
11/29/2004 12/16/2004 Endurance Mining 58.00 1
11/20/2004 03/31/2005 Endurance Mining 357.50 2
10/19/2004 12/16/2004 Endurance Mining 19.00 1
06/15/2004 06/15/2004 Endurance Mining 1.50 1
04/27/2004 06/29/2004 Endurance Mining 58.00 1
01/14/2004 03/10/2004 Endurance Mining 24.00 1
10/01/2003 12/02/2003 Endurance Mining 85.00 2
05/08/2003 05/09/2003 Endurance Mining 5.00 1
04/02/2003 06/26/2003 Endurance Mining 56.50 3
10/03/2002 12/13/2002 Endurance Mining 98.50 2
10/02/2002 10/02/2002 Endurance Mining 8.00 1
07/15/2002 09/26/2002 Endurance Mining 20.00 2
04/08/2002 06/28/2002 Mountain Edge Mining Inc 8.00 1
02/12/2002 02/12/2002 Mountain Edge Mining Inc 4.00 1
12/10/2001 12/10/2001 Mountain Edge Mining Inc 8.00 1
04/17/2001 04/17/2001 Mountain Edge Mining Inc 1.00 1
04/04/2001 04/17/2001 Mountain Edge Mining Inc 5.50 1
10/17/2000 11/14/2000 Mountain Edge Mining Inc 48.00 2
06/09/2000 06/24/2000 Mountain Edge Mining Inc 61.00 1
03/01/2000 03/01/2000 Mountain Edge Mining Inc 11.00 1
01/31/2000 03/21/2000 Mountain Edge Mining Inc 57.00 2