Ridge Crusher — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
07/28/2015 07/28/2015 Ridge Contracting Inc 2.00 1
07/17/2014 07/25/2014 Ridge Contracting Inc 23.00 1
08/27/2013 08/27/2013 Twin Peaks Construction 0.50 1
10/10/2012 10/11/2012 Twin Peaks Construction 22.50 1
08/07/2012 08/08/2012 Twin Peaks Construction 18.00 1
07/27/2011 07/29/2011 Twin Peaks Construction 22.00 2
11/29/2010 11/29/2010 Twin Peaks Construction 0.50 1
09/20/2010 09/29/2010 Twin Peaks Construction 45.75 1
09/15/2010 09/28/2010 Twin Peaks Construction 23.50 1