Ridley Pit — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 05/22/2025 | 05/22/2025 | Witzel Construction LLC | 16.25 | 1 |
| 06/03/2024 | 06/04/2024 | Witzel Construction LLC | 12.75 | 1 |
| 04/30/2024 | 05/02/2024 | Witzel Construction LLC | 5.00 | 1 |
| 07/12/2023 | 07/12/2023 | Witzel Construction LLC | 8.50 | 1 |