RITTER #19 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
09/09/2024 09/11/2024 KLOTZ SAND CO., INC 17.00 1
08/24/2023 08/25/2023 KLOTZ SAND CO., INC 11.00 1
07/11/2022 07/13/2022 KLOTZ SAND CO., INC 42.00 2
09/09/2020 09/09/2020 KLOTZ SAND CO., INC 10.00 1
06/05/2015 06/05/2015 KLOTZ SAND CO., INC 6.00 1
08/27/2013 08/27/2013 KLOTZ SAND CO., INC 2.75 1