River Canyon III — Inspections

Total: 33 inspections

Begin End Operator Hours Inspectors
02/12/2026 02/12/2026 Joy Engineering 2.75 1
02/05/2026 02/05/2026 Joy Engineering 4.25 1
03/06/2025 03/07/2025 Joy Engineering 7.00 1
10/08/2024 10/08/2024 Joy Engineering 5.00 1
03/19/2024 03/19/2024 Joy Engineering 5.00 1
05/26/2023 05/31/2023 Joy Engineering 9.00 1
05/17/2023 05/17/2023 Joy Engineering 0.75 1
05/13/2023 05/13/2023 Joy Engineering 0.50 1
08/09/2022 08/10/2022 Joy Engineering 6.50 1
10/04/2021 10/06/2021 Joy Engineering 13.50 1
05/05/2021 05/05/2021 Joy Engineering 2.50 1
01/29/2021 01/29/2021 Joy Engineering 4.25 1
07/13/2020 07/21/2020 Joy Engineering 12.00 1
10/16/2019 10/22/2019 Joy Engineering 7.50 1
04/02/2019 04/03/2019 Joy Engineering 28.25 2
10/11/2018 10/11/2018 Joy Engineering 4.25 1
05/21/2018 05/22/2018 Joy Engineering 8.00 1
02/05/2018 02/06/2018 Joy Engineering 8.00 1
06/09/2017 06/09/2017 Joy Engineering 3.75 1
11/30/2016 11/30/2016 Joy Engineering 5.50 1
08/08/2016 08/08/2016 Joy Engineering 5.00 1
03/30/2016 03/30/2016 Joy Engineering 2.75 1
09/03/2015 09/03/2015 Joy Engineering 2.25 1
08/31/2015 09/03/2015 Joy Engineering 21.25 1
03/10/2015 03/10/2015 Joy Engineering 10.25 1
01/29/2014 01/29/2014 Joy Engineering 18.00 1
08/08/2012 08/09/2012 Joy Engineering 12.50 1
08/10/2011 08/10/2011 Joy Engineering 8.75 1
10/22/2009 10/22/2009 Joy Engineering 7.75 1
05/12/2009 05/12/2009 Wes Construction 1.00 1
04/06/2009 04/06/2009 Wes Construction 0.75 1
10/07/2008 10/08/2008 Wes Construction 19.00 1
05/29/2008 05/30/2008 Wes Construction 12.25 1