River Canyon III — Inspections
Total: 33 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/12/2026 | 02/12/2026 | Joy Engineering | 2.75 | 1 |
| 02/05/2026 | 02/05/2026 | Joy Engineering | 4.25 | 1 |
| 03/06/2025 | 03/07/2025 | Joy Engineering | 7.00 | 1 |
| 10/08/2024 | 10/08/2024 | Joy Engineering | 5.00 | 1 |
| 03/19/2024 | 03/19/2024 | Joy Engineering | 5.00 | 1 |
| 05/26/2023 | 05/31/2023 | Joy Engineering | 9.00 | 1 |
| 05/17/2023 | 05/17/2023 | Joy Engineering | 0.75 | 1 |
| 05/13/2023 | 05/13/2023 | Joy Engineering | 0.50 | 1 |
| 08/09/2022 | 08/10/2022 | Joy Engineering | 6.50 | 1 |
| 10/04/2021 | 10/06/2021 | Joy Engineering | 13.50 | 1 |
| 05/05/2021 | 05/05/2021 | Joy Engineering | 2.50 | 1 |
| 01/29/2021 | 01/29/2021 | Joy Engineering | 4.25 | 1 |
| 07/13/2020 | 07/21/2020 | Joy Engineering | 12.00 | 1 |
| 10/16/2019 | 10/22/2019 | Joy Engineering | 7.50 | 1 |
| 04/02/2019 | 04/03/2019 | Joy Engineering | 28.25 | 2 |
| 10/11/2018 | 10/11/2018 | Joy Engineering | 4.25 | 1 |
| 05/21/2018 | 05/22/2018 | Joy Engineering | 8.00 | 1 |
| 02/05/2018 | 02/06/2018 | Joy Engineering | 8.00 | 1 |
| 06/09/2017 | 06/09/2017 | Joy Engineering | 3.75 | 1 |
| 11/30/2016 | 11/30/2016 | Joy Engineering | 5.50 | 1 |
| 08/08/2016 | 08/08/2016 | Joy Engineering | 5.00 | 1 |
| 03/30/2016 | 03/30/2016 | Joy Engineering | 2.75 | 1 |
| 09/03/2015 | 09/03/2015 | Joy Engineering | 2.25 | 1 |
| 08/31/2015 | 09/03/2015 | Joy Engineering | 21.25 | 1 |
| 03/10/2015 | 03/10/2015 | Joy Engineering | 10.25 | 1 |
| 01/29/2014 | 01/29/2014 | Joy Engineering | 18.00 | 1 |
| 08/08/2012 | 08/09/2012 | Joy Engineering | 12.50 | 1 |
| 08/10/2011 | 08/10/2011 | Joy Engineering | 8.75 | 1 |
| 10/22/2009 | 10/22/2009 | Joy Engineering | 7.75 | 1 |
| 05/12/2009 | 05/12/2009 | Wes Construction | 1.00 | 1 |
| 04/06/2009 | 04/06/2009 | Wes Construction | 0.75 | 1 |
| 10/07/2008 | 10/08/2008 | Wes Construction | 19.00 | 1 |
| 05/29/2008 | 05/30/2008 | Wes Construction | 12.25 | 1 |