ROY'S PIT — Inspections

Total: 22 inspections

Begin End Operator Hours Inspectors
06/09/2014 06/10/2014 R L CALLAHAN 8.50 1
06/04/2013 06/04/2013 R L CALLAHAN 6.75 1
10/09/2012 10/09/2012 R L CALLAHAN 5.75 1
02/28/2012 02/29/2012 R L CALLAHAN 10.25 1
09/27/2011 10/01/2011 R L CALLAHAN 14.25 1
07/21/2011 07/21/2011 R L Callahan Inc 5.25 1
01/10/2011 01/11/2011 R L Callahan Inc 13.50 1
05/18/2010 05/18/2010 R L Callahan Inc 3.50 1
05/12/2010 05/13/2010 R L Callahan Inc 22.50 1
02/16/2010 02/16/2010 R L Callahan Inc 3.50 1
01/21/2010 01/21/2010 R L Callahan Inc 12.50 1
07/14/2009 07/14/2009 R L Callahan Inc 5.25 1
09/09/2008 10/01/2008 R L Callahan Inc 4.75 1
03/13/2008 03/13/2008 R L Callahan Inc 14.25 1
12/05/2007 12/06/2007 R L Callahan Inc 11.00 1
01/10/2007 01/10/2007 R L Callahan Inc 9.50 1
12/15/2005 12/15/2005 R L Callahan Inc 3.75 1
11/30/2004 11/30/2004 R L Callahan Inc 11.00 1
03/31/2004 04/01/2004 R L Callahan Inc 23.00 1
09/25/2003 09/26/2003 R L Callahan Inc 11.00 1
06/20/2002 06/20/2002 R L Callahan Inc 4.00 1
07/18/2001 07/19/2001 R L Callahan Inc 21.00 1