Rush River Mine — Inspections
Total: 19 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/12/2022 | 07/13/2022 | Total Excavating LLC | 4.75 | 1 |
| 07/20/2021 | 07/21/2021 | Total Excavating LLC | 9.00 | 1 |
| 07/06/2021 | 07/06/2021 | Total Excavating LLC | 4.75 | 1 |
| 07/23/2020 | 07/23/2020 | Total Excavating LLC | 3.75 | 1 |
| 07/15/2020 | 07/15/2020 | Total Excavating LLC | 4.25 | 1 |
| 06/26/2019 | 06/26/2019 | Total Excavating LLC | 4.50 | 1 |
| 05/07/2019 | 05/07/2019 | Total Excavating LLC | 0.75 | 1 |
| 04/24/2019 | 04/25/2019 | Total Excavating LLC | 6.25 | 1 |
| 07/24/2018 | 07/24/2018 | Total Excavating LLC | 2.50 | 1 |
| 06/25/2018 | 06/27/2018 | Total Excavating LLC | 26.25 | 1 |
| 04/18/2017 | 04/18/2017 | Total Excavating LLC | 13.25 | 1 |
| 07/06/2016 | 07/06/2016 | Total Excavating LLC | 1.25 | 1 |
| 09/09/2015 | 09/09/2015 | Total Excavating LLC | 0.75 | 1 |
| 09/04/2014 | 09/04/2014 | Total Excavating LLC | 7.25 | 1 |
| 08/15/2014 | 08/16/2014 | Total Excavating LLC | 14.75 | 1 |
| 08/01/2014 | 08/01/2014 | Total Excavating LLC | 7.25 | 1 |
| 09/17/2013 | 09/17/2013 | Total Excavating LLC | 10.00 | 1 |
| 08/19/2013 | 08/19/2013 | Total Excavating LLC | 6.75 | 1 |
| 07/16/2013 | 07/17/2013 | Total Excavating LLC | 14.00 | 1 |