Saluda River Plant — Inspections
Total: 19 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/12/2018 | 01/12/2018 | Cooper Sand & Gravel Co Inc | 7.50 | 1 |
| 06/09/2017 | 06/16/2017 | Cooper Sand & Gravel Co Inc | 16.25 | 1 |
| 08/11/2016 | 09/06/2016 | Cooper Sand & Gravel Co Inc | 8.00 | 1 |
| 08/18/2015 | 08/18/2015 | Cooper Sand & Gravel Co Inc | 6.25 | 1 |
| 08/18/2015 | 08/18/2015 | Cooper Sand & Gravel Co Inc | 0.75 | 1 |
| 03/04/2015 | 03/04/2015 | Cooper Sand & Gravel Co Inc | 2.00 | 1 |
| 09/09/2014 | 09/09/2014 | Cooper Sand & Gravel Co Inc | 8.25 | 1 |
| 06/19/2014 | 06/19/2014 | Cooper Sand & Gravel Co Inc | 3.50 | 1 |
| 05/16/2013 | 05/17/2013 | Cooper Sand & Gravel Co Inc | 4.50 | 1 |
| 08/13/2012 | 08/13/2012 | Cooper Sand & Gravel Co Inc | 7.50 | 1 |
| 02/23/2011 | 03/01/2011 | Cooper Sand & Gravel Co Inc | 8.75 | 1 |
| 10/08/2008 | 10/08/2008 | Cooper Sand & Gravel Co Inc | 4.00 | 1 |
| 12/12/2007 | 12/14/2007 | Cooper Sand & Gravel Co Inc | 17.00 | 1 |
| 09/19/2006 | 09/21/2006 | Cooper Sand & Gravel Co Inc | 11.00 | 1 |
| 07/05/2006 | 08/02/2006 | Cooper Sand & Gravel Co Inc | 56.75 | 1 |
| 10/15/2003 | 10/16/2003 | Cooper Sand & Gravel Co Inc | 24.00 | 1 |
| 09/16/2003 | 09/17/2003 | Cooper Sand & Gravel Co Inc | 38.00 | 1 |
| 04/30/2002 | 05/07/2002 | Cooper Sand & Gravel Co Inc | 20.00 | 2 |
| 05/08/2001 | 05/09/2001 | Cooper Sand & Gravel Co Inc | 21.00 | 1 |