San Bernardino Plant — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/05/2011 | 01/05/2011 | Empire Rock Inc | 8.50 | 1 |
| 04/21/2010 | 04/23/2010 | Empire Rock Inc | 16.00 | 1 |
| 10/29/2009 | 11/05/2009 | Empire Rock Inc | 22.75 | 1 |
| 09/03/2009 | 09/03/2009 | Empire Rock Inc | 14.00 | 1 |
| 07/14/2009 | 07/16/2009 | Empire Rock Inc | 34.00 | 1 |