Sand Plant No. 2 — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
10/24/2024 10/24/2024 Jobe Materials, L.P. 3.00 1
04/30/2024 05/02/2024 Jobe Materials, L.P. 24.50 1
09/05/2023 09/05/2023 Jobe Materials, L.P. 6.50 1
09/13/2022 09/13/2022 Jobe Materials, L.P. 8.50 1
03/25/2021 03/26/2021 Jobe Materials, L.P. 13.00 1
04/29/2020 04/29/2020 Jobe Materials, L.P. 7.25 1