Screen #3 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 12/03/2024 | 12/06/2024 | Brutill Construction, Inc | 14.00 | 1 |
| 06/06/2024 | 06/06/2024 | Brutill Construction, Inc | 4.75 | 1 |
| 08/14/2023 | 08/22/2023 | Brutill Construction, Inc | 40.00 | 1 |
| 08/14/2023 | 08/15/2023 | Brutill Construction, Inc | 5.75 | 1 |