Screen Plant 1 — Inspections

Total: 13 inspections

Begin End Operator Hours Inspectors
05/11/2016 05/24/2016 Langle Excavating 5.00 1
04/26/2016 04/26/2016 Langle Excavating 0.50 1
04/26/2016 04/26/2016 Langle Excavating 7.75 1
09/28/2015 09/28/2015 Langle Excavating 1.50 1
08/19/2015 08/19/2015 Langle Excavating 11.00 1
08/27/2014 08/27/2014 Langle Excavating 4.25 1
07/23/2013 07/23/2013 Langle Excavating 16.25 1
06/12/2013 06/12/2013 Langle Excavating 3.00 1
04/09/2013 04/09/2013 Langle Excavating 7.00 1
05/02/2012 05/02/2012 Langle Excavating 4.00 1
04/24/2012 04/25/2012 Langle Excavating 12.50 1
11/17/2010 11/17/2010 Langle Excavating 3.00 1
10/20/2010 10/20/2010 Langle Excavating 24.50 1