Screen Plant #2 — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/27/2026 | 01/27/2026 | Central Washington Asphalt | 9.25 | 1 |
| 09/10/2024 | 09/11/2024 | Central Washington Asphalt | 8.50 | 1 |
| 08/02/2023 | 08/02/2023 | Central Washington Asphalt | 1.25 | 1 |
| 08/01/2023 | 08/02/2023 | Central Washington Asphalt | 13.75 | 1 |
| 08/19/2022 | 08/19/2022 | Central Washington Asphalt | 3.25 | 1 |