Screen Plant #2 — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
01/27/2026 01/27/2026 Central Washington Asphalt 9.25 1
09/10/2024 09/11/2024 Central Washington Asphalt 8.50 1
08/02/2023 08/02/2023 Central Washington Asphalt 1.25 1
08/01/2023 08/02/2023 Central Washington Asphalt 13.75 1
08/19/2022 08/19/2022 Central Washington Asphalt 3.25 1